Indeed, the proper framing is BAAJA vs. the status quo, which is blocking the clean energy build-out we desperately need. We need roughly 5,000 miles of new high-voltage transmission lines every year to clean up our power grid. In 2024, we only built about 300 miles.

If BAAJA doesn't pass the House now, figures like Huffman and Merkley will make it impossible to pass permitting reform that could get a veto-proof majority over the next two years. Demands to wait for something better is why we're so far behind in the first place, and we can't keep waiting. BAAJA must be passed. It has strong support from clean energy groups and blue-collar unions, and it is widely viewed as a clear net positive.